Completed Projects


Sl.

No.

MINING PROJECTS

Client

COST IN LAKHS.

1.

Blast hole drilling, Excavation, Loading, Transportation & dumping etc., of over burden at Block A of Gouthamikhani open cast Project

Kothagudem in AP

Singareni Collieries Company Ltd.

Rs. 2583.00 Lakhs.

2.

Blast hole drilling, Excavation, Loading Transportation & dumping etc., of over burden at OC-II, Ramagundam open cast Project Ramagundam of SCCL

Ramagundam Area in AP

Singareni Collieries Company Ltd.

Rs. 5000.00 Lakhs.

3.

Hiring of HEMM, Tippers, Drills & Dozers for removal of all type of material etc at Ukni OC Mine of Wani North Area.

Wani North Area

Western Coalfields Limited

Rs. 1833.21 Lakhs.

4.

The Work of Hiring of Equipment for overburden removal ( Blast hole drilling, loading, hauling, and dumping of broken rocks/soil/earth by mechanical means) at Jayanth OCP,

Jayanth OCP in Madhya Pradesh

Northern Coalfields Ltd.

Rs. 13400.02 Lakhs.

5.

The Work of Hiring of Equipment for overburden removal ( Blast hole drilling, loading, hauling, and dumping of broken rocks/ soil/ earth by mechanical means) at Krishnashila OCP,

Madhya Pradesh

Northern Coalfields Ltd.

Rs. 17832.96 Lakhs.

6.

Removal of Over Burden of First Dig (Solid) by Hiring of Equipment such as Excavators, Tippers/ Dumpers, Drills, Dozers, Graders and Water Sprinklers for Composite Work Consisting of Blast Hole Drilling, Excavation, Loading, Transportation of Broken Rocks/ Soil/ Earth, Unloading/Dumping, Spreading, Dozing, Water Sprinkling and Grading etc. by Mechanical Means as per Instruction of Engineer Incharge at Specified Places

KRISHNASHILA OCP of NCL

Northern Coalfields Limited

Rs. 16306.688 Lakhs.

7.

Blast hole drilling, controlled blasting with shock tube initiation, excavation, loading, transportation, dumping etc., of Over Burden at Khairagura OCP,

Bellampalli Area, Adilabad District

Singareni Collieries Company Ltd.

Rs. 26978.00 Lakhs.

8.

Extraction of 21.411 LBCM of coal / shale with surface miner, Including loading, transportation, dumping etc., At PIT-II of Koyagudem opencast project-II,

Yellandu Area, Khammam District, A.P

Singareni Collieries Company Ltd.

Rs. 1076.00 Lakhs.

Sl.

No.

IRRIGATION PROJECTS

Client

COST IN LAKHS.

1.

EWE of Flood Flow canal from KM 6-11, 12.60-14, 17-18, 19-20 & 27.-28.40,

I & CADD, Govt. of A.P.

I & CADD, Govt. of A.P.

Rs. 4332.67 Lakhs.

2.

EWE of Flood Flow canal from KM 45.00 to 50.000 of SRSP,

Jagityal (AP)

I & CADD, Govt. of A.P.

Rs. 2163.03 Lakhs.

3.

EWE and construction of CM & CD Works of Flood Flow canal from KM 57.00 to 70.000 of SRSP,in Jagityal (AP)

I & CADD, Govt. of A.P.

Rs.17550.00 Lakhs.

4.

Improvements to Nallamada Drain above Commamur canal from km. 3.00 to km. 14.100 in Guntur district.

Guntur district

I & CADD, Govt. of A.P.

Rs.1056.41 Lakhs.

5.

Investigation, preparation of hydraulic Particulars, designs and drawings and Excavation of H.N.S.S. Main Canal from K.M. 20.000 to K.M. 42.000, including CM & CD works and distributory system to feed an ayacut of 2300 acres Kharif I.D.

I & CADD, Govt. of A.P.

Rs. 5778.00 Lakhs.

6.

Investigation, preparation of hydraulic Particulars, designs and drawings and Excavation of H.N.S.S. Main Canal from K.M. 77.000 to K.M. 100.000, including CM & CD works and distributory system to feed an ayacut of 5100 acres Kharif I.D.

I & CADD, Govt. of A.P.

Rs. 5535.00 Lakhs.

7.

EWE and construction of CM & CD Works of Flood Flow canal from KM 86.00 to 103.000 of SRSP,

Jagityal in AP

I & CADD, Govt. of A.P.

Rs. 20325.47 Lakhs.

Sl.

No.

INFRASTRUCTURE PROJECTS

Client

COST IN LAKHS.

1.

Site Levelling Works Package for SIPAT Super Thermal Power Project, Stage - I, 3 X 660 MW

NTPC

Rs. 1039.50 Lakhs.

2.

Offsite Civil Works Package-II of Talcher, Super Thermal Power Project Stage-II",Orissa . Earth work & Concreting work,

(in association with Engineering Projects (I) Ltd, A Govt. of India Enterprise,)

NTPC

Rs. 1176.84 Lakhs.

16.

Evacuation of Ashpond & Site Development works (Job-C) for Visakhapatnam Steel Plant

Specification No.VSP/DEG/TPP/88

Rashtriya Ispat Nigam Limited

Rs. 910.95 Lakhs.

Sl.

No.

TUNNEL PROJECTS

Client

COST IN LAKHS.

1.

Construction of Single Line BG Tunnel No 8 at Km.93/004 to Km 93/420 between Mahur - Migrandisa station & Tunnel No. 9 at Km.97/994 to Km.98/194 between stations Migrandisa-New Haflong including earthwork (A subcontract from Maytas Infra Ltd.)

Northeast Frontier Railway

Rs. 2199.78 Lakhs.

 

Irrigation

Water is the ‘Elixir of Life’ and Sushee Infra is a specialist when it comes

Read More

Mining

Sushee Infra focuses on long-life, lowcost, high-quality mining assets.

Read More

Infrastructure

Sushee Infra is playing an active part in building India’s landmark road projects

Read More

SUSHEE Realty

Sushee Realty was incorporated Jan 2012. It has prepared itself fully to face tomorrow’s challenges in the field

Read More