Construction of Single line BG Tunnel

Tunnel_post1

Construction of Single line BG Tunnel No.19A (App. Total Length 388 RM ) from Km 77.920 to Km 78.308 and Tunnel No.19 (App. Total length 1111 RM) from Km 78.549 to Km 79.660 in between Jiribam to Imphal in connection with Construction of New Railway Line Project Jiribam –Tupul (Imphal).